Saturday, January 9, 2016
Drowning in my Togs...
It is hard to believe that the first week of the year is over already! Only 6 weeks to go until WBP is completely finished prior to our first wedding, and we have been busy buying all the necessary things for the event and the accommodation. Over the last 2 weeks we have purchased literally hundreds of crystal glasses, fine china plates, bowls, cups, saucers, best quality knives, forks, and spoons; napkins, table cloths, table skirts, chair covers, chair sashes, rectangular tables, round tables, flannels, hand-towels, towels, bath mats, sheets, pillowcases, duvets, covers, mattress protectors, pillow protectors and bathrobes!
So many things to learn: Tog rating, thread counts, vitrified, machine wash, dry-clean only. And so many things which I thought I knew which I have had to re-think, such as how to determine the quality of a sheet!
It transpires that thread counts these days are misleading. Many years ago a very trusted and close friend told me that I shouldn’t buy anything with a thread count less than 500, and that 1000 was the ideal one we should punt for for WBP as that would be softer.
However, it turns out after more research that this very common understanding is actually grossly flawed. Everybody knows that thread count is the warp plus weft in a square inch (the sum of the number of vertical strands of cotton and the number of horizontal strands). So it is common sense that one could only possibly fit a certain number of strands into a square inch. This turns out to actually be about 300. So how do you end up with sheets that are advertised as 1000 TC?
Manufacturers started to count the ply in a strand of cotton separately. Think about buying wool (yarn). You can buy 2, 4, 6, 8 ply yarn, but you’re still knitting with a single strand of wool, it is just thicker. If a manufacturer uses cheap 4 ply cotton at 150 vertical and 150 horizontal strands per inch, while the real thread count is only 300 it is being advertised as 1200.
In order to fit this many strands into a square inch, each ply of cotton must invariably be thinner and thus can actually be of very poor quality. In summary, you would be better off buying 300 TC sheets made from a high quality cotton than '1200 TC' sheets made from multiple ply inferior cotton which didn’t last as long and wasn’t as soft.
So, we’ve established anything over 300 TC is acceptable if the way they count the thread is honest and if it is a good quality cotton. What constitutes a good quality cotton you may ask? Again, my well beloved friend said one must go for 'Egyptian cotton'. After more research one has discovered that this encompasses multiple definitions depending on what a manufacturer wishes to market.
The original Egyptian cotton came from the plant Gossypium barbadense, a plant which grew along the Nile and was prized for the length of the strands it produced. So, now we find that it is possible to buy linen marketed as Egyptian cotton which is not actually Gossypium barbadense, but is grown in Egypt as well as being able to buy linen from cotton that does come from Gossypium barbadense, but which is not grown in Egypt (which due to climate and soil type may not be as good as the original plant grown in the right place under the right conditions).
Above: Gossypium barbadense
But surely you just need to take it out of the packet and feel it to be able to tell whether it is a high quality soft fabric? Wrong, manufacturers are also starting to apply waxes and polishes to their fabrics to make them feel soft and luxurious according to Scott Tannen in an article for Business Insider Australia. Unfortunately these wash out after a couple of washes. You only really know how soft your sheets are going to be after a couple of washes. If they remain soft or get even softer you are onto a winner.
So, what I have learnt is read the packet, look carefully at the weave, take it out and feel how thick the fabric is, and only shop at reputable retailers.
We ended up buying a variety of brands of sheet sets, duvet covers, duvets, pillows, pillow and mattress protectors, pillowcases, coverlets, etc. and managed to get them all in a '2 for 1' deal because it was the silly season...
Similarly when it comes to duvets and pillows their stuffing is rated on the Tog system in the UK (a system of testing the insulating properties of a fabric, developed in Manchester in the 40s). The idea is that for warmer summer months you should choose a lighter tog weighting (typically 3.0 – 4.5) in colder months you may need a tog rating as high as 12.0-13.5, and in intervening months something in between.
In NZ the tog rating is not widely used, but the products are sold with good descriptions of their suitability, usually arranged on the shelves in summer, autumn/spring, and winter. We chose high quality intermediate duvets on the basis that WBP is air-conditioned and has 1 foot thick masonry walls and double glazing, therefore has a stable temperature inside most of the year round.
Well, we still have a big list of things to get done in the next few weeks, such as putting the final column details on, completing the top-course of the driveway and courtyard, putting in the courtyard fountain, sourcing noise-limiters, getting stationery printed, setting up the in-room electrical systems, sewing the curtains, installing the security cameras, finishing the final landscaping details including lighting, repainting the boat, fixing the lights to the front entrance along with brass plaques, and removing the old green barn. Still, we have a detailed project timeline for the coming weeks so we are confident everything will be completed well on time with a full compliment of tradesmen commencing again this Monday after their Christmas break.
Labels:
Bed Linen,
Fine Linen,
Linen,
progress update,
Thread Count,
Tog Rating
Wednesday, December 16, 2015
Almost There....
Peter has sent me lots of photos of the fast paced work that has occurred over the past week in order to allow us to move in by Christmas, even if there is ongoing external work. Here they are lifting all the plinths and balustrades up to the top terrace ready to be installed next week. We still have to find a design for the urns to go on top of them (as the last post on Chiswick House demonstrated, one can never have too many urns!).
While they had the crane there they also lifted up some of the heavier items of furniture which we would never get up the staircase or in the lift.
Peter has started to put together some of the furniture. This is the Chinese bed in the Blenheim Suite The chinoiserie wallpaper gets hung this week, and then the sconces will be fitted and the room will be finished.
Below: The balloon chair in matching silk and the Chinese mirror.
Unpacking the bedside tables for the Master Suite...
The skeleton of the kitchen being assembled. We have been told it will be finished in time to cook Christmas dinner.
The balustrades for the landing upstairs...
They have to be this close together to ensure silly people don't fall through them!
Below: The oak floor being laid in the ballroom.
The red silk upholstery being put on the dining room walls...
Peter and our friend Dirk have also been getting some of our furniture out of storage. Items like this dining table, which came from Westminster Abbey, have not been out of storage since we packed up our home in London and shipped them to NZ seven years ago!
Unpacking boxes of things we haven't seen for this long really will be like Christmas. I get home on the 20th, so there will be a lot of late night interior decorating going on before our international guests arrive on the 23rd. Never mind, I pulled together our London apartment in time for a house warming in 24 hours, and we have had 7 years to plan for this moment. Believe me, I know where every single piece of furniture, every vase and every painting is going. All I will need is a strong pot of coffee...
Labels:
balustrade,
progress update,
Upholstered Walls
Monday, November 30, 2015
Progress Update Part 3...
Thanks for joining us for the last part of our progress update with a stroll around the grounds. Here are some photos taken on a sunny day.

Above: The view of the manor from the Urn en flambeau Parterre.
Below: View of the manor and carriage house from the lake.
Below: The Urn Parterre. The buxus hedging has taken off despite the rabbit problem, although the rabbits have dug out many of the irises in an attempt to excavate a warren underneath the urn. I feel more rabbit pie will be on the menu this autumn. I love the way the established trees in the distance provide a backdrop of the parterre down the view of the lime walk. It's almost as if it was planned that way :-)


Below: A view back up the lime walk from the parterre.

Some of the bedding plants close up...
Antirrhinum (Snap dragons)
Dianthus (Pinks)

Across the lawn on the other side of the parterre is one entrance to Badger's Wood. This has certainly established itself in the last 2 years (original post here)...

We have Pukeko's nesting in the woods. Here is one that is protecting a nest of fledglings.
For other bird life at Willowbrook Park see our post on Ornithology here.
Above: Our Diamond Jubilee Oak tree has grown too in the last couple of years.
Below: The Sloe Spinney.
More photos of the wood looking back on the pathway from the other end.
The knot garden has down well since last autumn, and soon the plants will form a nice hedge.
Peter has been busy grooming the beds and topiarising the corner plants into perfect pyramids.

Above: The Gertrude Jekyll Roses
Below: A giant gunnera, which is to be moved to the brook by the bridge in autumn. Is will be a hot dry summer and anything we attempt to transplant before then won't survive.


The currants are doing very well this season...

... as are the vines. Come autumn we should have our first decent harvest of table grapes, and when the wine grapes are planted we will be able to start our domestic viticulture.


Above: A splendid hedge rose in the orchard.
Below: Another in the lime walk.

The bees are having a marvelous time.

View from site of rotunda towards urn parterre again.

The Elysium Field, the site of our future wildflower meadow, which has been grown for hay for emergency stock tucker over the summer should we run into a drought (always prepared).
Sunday, November 29, 2015
Progress Update Part 2...
Climbing up the newly laid stairs, our update continues with the first floor.
Above: The stairs being laid. My OCD is such that we had to have solid one piece treads and risers, as when I walk up tiled stairs the lines of grouting do my head in...
Above: View of landing from long gallery. The balusters have all been made for the stairwell and balcony, so these should be able to be installed next week. We're still not sure whether the banister will be carved wood or formed from pouring coloured concrete into boxing on site. There are pros and cons to each. We had to ditch our ideas of wrought iron balustrade and banisters as we had seen the quality of the ironwork being imported for other projects which was terrible, and having the same product made to our drawings in NZ would cost an arm and a leg. We have used to following staircase for our inspiration for the finished balustrade...
Above: View across landing near top of stairs.
Below: Upstairs powder room. A smallish space, but still better to have an additional space for guests to freshen up; and it is well appointed. We have a lovely mirror to hang above the vanity.

The Brideshead Suite is almost ready for use as well. Below a view looking towards the bed end...
and with the furniture waiting to be unwrapped and placed...

Looking towards the other end of the suite:

Inside the bathroom, a view of the spa bath with the Rowe and Perrin fittings all plumbed in.

The curved marble with handmade cornicing came out well.
The vanity and loo...

The Chatsworth Suite...

This suite too is ready to be furnished and used.
Above: View from where the bed will be positioned.
Below: Views towards (left to right) the entrance door, wardrobe, espresso bar, and bathroom.
Space inside for fridge (bottom left), and the shelf above that (which will be finished with a marble surface) upon which the nespresso machine and tea tray etc will be. Then there are an additional 2 shelves to be added to the unit above for other things (? what exactly).
The Chatsworth vanity and loo (red marble, gold taps).

The Blenheim bathroom (gray marble, nickel taps).

The Blenheim suite is yet to be wallpapered, but once it is we will share some more pics. Here is the furniture in the Blenheim suite waiting to be unwrapped and placed after the papering is done.

The Master Suite

Above: View as you walk into the room.
Below: View facing south corner.
Below: Fireplace and chandelier. Once all the crystals are hung there will only be an inch of head clearance. Alas, it can not be hung any higher, but being a little lower is more traditionally Georgian, and it will allow light to shine onto the four-poster, which it wouldn't if it was a foot higher.


The Master Bathroom
Master Vanity
and master shower (AKA 'the carwash').

David's Study (AKA 'The Lords').
The unpainted spaces above are to be fitted with cabinetry as per diagram below...
... but alas when the furniture arrived it was the wrong size and the wrong colour (even though there were several detailed and well dimensioned drawings which were sent). So, we have had to order the same again in the correct size and colour, which being made overseas will not arrive until late January, early February. I will look forward to relaxing in my study then with a glass of scotch to celebrate the end of this long running saga.
Below: The furniture before it was unpackaged.

This was the same for Peters study (AKA 'The Commons').
Peter loves the green colour of his walls. Here is a closeup of his door handle...
Join us tomorrow for a stroll around the grounds in our last update post before the big shift on the 20th December.